Machine unloaded with improvised workspace, Cordillera Teparo in the background |
Panorama of biomass drier and workspace |
Fixing the water connection |
Installing flare and chimney |
manifold in progress |
French volunteers loading bamboo into crates |
Loading the first crates |
The ceremonial first lighting |
Bamboo catching before closing door |
Engineer explaining machine function |
Wake Forest group during first burn |
Yilbonio and Abdou unloading first batch of char and reloading feedstock crates |
Side by Side comparison of Guadua bamboo and Guadua biochar from first batch |
Abdou and Miles reloading crates |
David and Oswaldo inspecting interior, 309s stainless steel heatshield visible above |
Sprinkler system for temperature regulation |
Timo, Gilberto and Aparicio installing water system |
Machine prepped and ready to run |
Measuring distance to transformer for electrical cables |