Thursday, July 10, 2014

Biochar Oven Instalation: Update 10 - Electricity and Water





Measuring for the wire and the wire laid.


Wire delivered, ready to install


8-gauge, insulated aluminum wire



View of the existing lines





Tightening the cables between posts



Working on the transformer


Cutting posts for the new cable

the 3 meter deep grounding pit for a copper rod.  Eventually filled with a mix of bentonite and salt from the Inca salt mines in Maras for conductivity.





The TeeJet nozzles assembled stainless steel nipples and galvanized pipes.


PVC water system with galvanized steel pipes, and thermocouples.



Nozzles sticking through the ceramic insulation and stainless steel mesh.