| June 11: Day before the arrival of the Australian engineer |
![]() |
| June 12: First day, preparing tools. |
![]() |
| June 13: Work site with plasma cutter and compressed air tank on left |
![]() |
| June 13: Cutting holes in air duct work |
![]() |
| June 13: Jose and Carlos marking and cutting holes |
![]() |
| June 14: Final touches on interior support frame |
![]() |
| June 14: Welding outer mesh to structure to secure insulation |
![]() |
| June 14: Wiring mesh to structure to prepare for welds |
![]() |
| June 15: Welding end mesh and securing interior mesh |
![]() |
| June 15: Cutting cart to prepare for alteration |
![]() |
| June 16: Finished mesh |
![]() |
| June 16: Locating stainless steel air pipes |