Pyrolysis Unit Construction Update 5: First Half of Build

June 11: Day before the arrival of the Australian engineer

June 12: First day, preparing tools.

June 13: Work site with plasma cutter and compressed air tank on left

June 13: Cutting holes in air duct work

June 13: Jose and Carlos marking and cutting holes

June 14: Final touches on interior support frame

June 14: Welding outer mesh to structure to secure insulation

June 14: Wiring mesh to structure to prepare for welds

June 15: Welding end mesh and securing interior mesh

June 15: Cutting cart to prepare for alteration

June 16: Finished mesh

June 16: Locating stainless steel air pipes